DPW Weekly Roadway Construction Updates
Week of May 13, 2024
Breckwood Blvd. from Boston rd. to Wilbraham Rd. - Mill
Hall of Fame Ave. from Memorial Bridge to South St. – Thermo striping 5/20 – 5/24
Island Pond Rd. from Overlook Dr. to Allen St. Thermo striping 5/20 – 5/24
Aberdeen St. – Install drainage
Burdette St. – Install drainage
Desrosier St. – Install curbing
Hamburg St. – Install curbing
Sterling St. – Install curbing
Van Buren St. – Install curbing
Worthy St. – Install curbing
Sidewalk Reconstruction:
Liberty Heights Neighborhood
Pine Point Neighborhood